Full gut remodel, owners out of the country
A complete gut-and-remodel finished while the owners and designer were in Canada for the summer — done three days before they got back.
- Location
- Palm Desert
- Type
- Bathrooms
Managed from a distance
Greg sent daily photos and overnight paint samples back and forth, and finished three days before the owners returned for the season.
after




Planning something similar?
More bathrooms

Accessible bathroom with roll-in shower
San DiegoA tiny back bathroom and an awkward corner of the bedroom became one large accessible bath with a roll-in shower, jetted tub and a wheelchair-ready vanity.

Insurance rebuild: double shower & arched vanity
Rancho PeñasquitosAfter water damage and mitigation, a full bathroom rebuild: walk-in double shower with a patterned feature wall and an arched vanity niche.

Glass tile shower
La CostaBlue glass subway tile, a pebble shower floor and frameless glass.